straw.jpgIn my last post about the house I mentioned that the bales would be arriving on the 18th or so, this alas did not happen. Our farmer had a trip he had to take for two weeks and on the 17th the flax was still not ready to cut. So we weighed our alternatives and started calling around to see if we could get another source. We did, and got three wagon loads of straw ables delivered over the last two weeks.

Last night we finally installed a few test bales to see how well our notching system would work. It needs to be fine tuned but everything is looking OK! We also tested out our home made “schutz gun” clay slip sprayer. It’s basically an undercoating spray gun used upside down with a large gravity fed hopper instead og the siphon feed it’s meant to employ. It cost $27 from Canadian Tire and it works great!

The other step forward we made was with the foundation insulation parging. We used three pails of Parge Plus over the rigid foam covering the foundation edges as cement parging will not adhere well to foam. What a nightmare! The product is thick and hard to work and sets up extremely fast! By the third bucket we had the hang of it but it was tough, slogging work!

And so we are making the last preparatory steps this week to go full out over the long (Thanksgiving) weekend installing the straw bales! I am hoping as many old friends and new ones stop by to help out or even just watch, leave a comment if you need directions, and i hope our house inspires people do make greener choices in the way they build their house!


Actions

Informations

Leave a comment

You can use these tags : <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>