Photo Update – Grading to Interior Framing
30 01 2008It’s been a while since we updated with some photos so here we go. Later this week we’ll upload some photos of the M&E rough-in’s so far and some more interior work that has been done. Winter, the holidays, a new job, and finding out we are expecting has caused a bit of a slow down in work on the Shire Home, but we hope to get back on track soon!
Before rough backfilling could begin around the house conduit had to be laid to run the underground power into the house. Because of the overhang and supporting post footings this had to be dug by hand. A 20 foot trench three feet deep doesn’t sound that bad till you have to dig it yourself
Here the dozer is spreading out loads of fill over our septic field. Instead of hauling in loads of fill from elsewhere we got it from my wife’s sister’s lot next door where they were wanting to dig a pond! It saved us money on fill and they got the pond they wanted for free!