Cement floors and cement board

12 03 2009

IMG_1204.JPGThings are progressing at the house and really starting to take shape, especially after taking a night to clean the bulk of the dirt and mud that was on the floors downstairs! When the floors are wet they look fantastic, almost like polished black marble and hopefully when polished and waxed they will keep this appearance.

IMG_1205.JPGIMG_1206.JPG

You can see the wall behind the woods tove is finally in, the stove pipe is just disconnected while I put a skim coat over the cement board so it will look as smooth as drywall. There is also a tall narrow cubby for fire wood and a shelf for our backup electric utility heater for when we are away from home for extended periods of time. The back of the firewood cubby will have a removable panel to access the back side of the fan unit in the utility room as well.

IMG_1207.JPGUpstairs we are finishing up the cement board work in the bathroom so tiling can begin this weekend, the shower and bottom 3′ of the walls and floors all being tiled. The curved shower wall was abit of a challenge but we found that 1/4″ cement board will bend around the radius we had as long as you eased it into it (which needs at least two sets of hands!) Our EPS foam premanufactured sloped shower base was maybe installed a bit too soon in the process and despite our best efforts to protect it has seen a few dents and dings along the way, hopefully this won’t be too big an issue after the waterproof membrane is installed over it.

IMG_1210.JPG

IMG_1213.JPG

IMG_1215.JPG

Wiring for the house has been progressing as well with lights being wiring and plugs activated in the past few days. Upstairs we are getting ready to install the living room ceiling lights and hanging lights over the stairs. Haste in putting in the ceiling led to some gaps that the light fixture bases couldn’t hide so we had to make some wooden “escutcheon” plates to make up for that.

IMG_1216.JPG

IMG_1218.JPG

We are hopefully selecting finish paint colours for the house and starting finish paint, tiling and finish trim this weekend! The progress on the house seems much faster now that we are past the stucco stage that I wish I could take time off to work full time on it again but I must be content with 3-4 hours a night and weekends for now!