House Progress
15 07 2009It’s been a long time since I did an update on the house. No, we are not moved in yet. No, I don’t know when we will be moving in. But I hope very soon.
The electrical work is 99.99% complete.
The light fixtures are all installed and working.
The stairs are in and the railing is up but still needs balusters installed.
The cedar bathroom vanity has been built (from scratch by me!)
The kitchen cabinets are installed, the cabinet doors are half done and drawers and countertops are starting soon.
The window trim is 90% done.
The interior doors are just under half done.
The baseboards are about 20% done.
The washer and dryer are in and working!
Here are some photos from Canada Day of the lights after they were installed. Link to Picasa album with larger photos.